Aerial, Underground and
Inside plant Multi-pair Splicing
Voice over IP
Boston College
Data, voice and cable TV network connections from two main,
and eleven remote network rooms to 450 student dormitory beds.
This fast paced construction project was completed over the
Summer break.
Minuteman Technicial School
Installation of Category 5e horizontal cabling to extend the
existing local area network to many new administration offices,
classroom and labs. Fiber optic backbone cabling and the installation
of all active optical components to extend the network.
Town of Watertown
Fiber optic interconnection of the Town Hall, Police Department,
Fire Stations and other municipal buildings. Design, acquisition
and configuration of all network equipment including all premise
data cabling infrastructure throughout all buildings.
American LEWA
This phased upgrade to all workstations in the main administration
building, workshop and warehouse areas had to be completed while
maintaining the existing voice and data network with no down-time
for any departments.